One of the objectives of the Hatirjheel project is to conserve rain water, prevent water logging and flooding, improve sewerage system, reduce traffic congestion in the capital and enhance the beauty of the city. But less than a year later, the project looks bleak.

Hatirjheel is one of the most scenic places in the capital at present. The whole area has been built on new infrastructure. It was inaugurated and opened to the public on January 2, 2013. As a result of the launch of this project, the residents of Tejgaon, Gulshan, Badda, Rampura, Mouchak and Magbazar areas of Dhaka are getting special benefits. Not only that, Hatirjheel has already become one of the favorite travel destinations of Dhaka people.

The Hatirjheel project is being implemented and supervised by the Special Works Organization (SWO) of the Bangladesh Army. According to the information received, the Hatirjheel project was established on a total of 302 acres of land at a cost of Taka 1,961 crore. Of this, Tk 1,046 crore has been spent on land acquisition. The acquired land includes 47 per cent of RAJUK, 61 acres of Court of Wax, 141 acres of public land and 1 acre of BTV. The project was approved by the ECNEC in October 2006. The three-year project was originally scheduled to be completed by June 2010, but was later extended by another year and a half. Construction of 7.60 km long express road in Hatirjheel project to connect east and west of Dhaka metropolis, 7 km long service road to facilitate communication of local people, construction of four bridges 46.25 m long, 6.0 km long for the convenience of pedestrians and travelers respectively. And 9.80 km long lakeside walkway, three 260 m long viaducts and 400 m long overpasses, intersections and roundabouts to keep the project area congested. The project will remove 10.45 crore cubic feet of waste, 10.40 km. Waste management in the project area will be made effective by installing main diversion sewerage line.

Faded elephant lake